{"id":2300,"date":"2022-07-11T12:19:04","date_gmt":"2022-07-11T12:19:04","guid":{"rendered":"https:\/\/ucees.pl\/ucees-sp-z-o-o-spolka-komandytowa-realizuje-projekt-dofinansowany-z-funduszy-europejskich\/"},"modified":"2025-09-08T19:18:58","modified_gmt":"2025-09-08T19:18:58","slug":"ucees-sp-z-o-o-spolka-komandytowa-realizuje-projekt-dofinansowany-z-funduszy-europejskich","status":"publish","type":"post","link":"https:\/\/ucees.pl\/en\/ucees-sp-z-o-o-spolka-komandytowa-realizuje-projekt-dofinansowany-z-funduszy-europejskich\/","title":{"rendered":"UCEES Sp. z o.o. Limited Partnership is implementing a project co-financed by European Funds"},"content":{"rendered":"<p>POIR.06.02.00-12-0028\/21<\/p>\n<p><strong>The total value of the project is: PLN 132,700.00, EU funding: PLN 112,795.00<\/strong><\/p>\n<p>&#8220;Implementation of digital technology in UCEES Sp. z o.o. sp.k., through the purchase of the AEC Collection license for parametric building information modeling (BIM) and IT equipment, in connection with the need to make changes to processes and the way the company operates in epidemic conditions, and to strengthen the company&#8217;s resilience in case of further similar crises caused by the state of an epidemic.&#8221;<\/p>\n<p>The aim of the project is to introduce a process innovation (a significantly improved process) using digital technology by purchasing the AEC Collection license for parametric building information modeling (BIM).<\/p>\n<p>Funded as part of the Union&#8217;s response to the COVID-19 pandemic.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-799 size-full\" src=\"https:\/\/ucees.pl\/wp-content\/uploads\/fundusze2.png\" alt=\"\" width=\"564\" height=\"41\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>POIR.06.02.00-12-0028\/21 The total value of the project is: PLN 132,700.00, EU funding: PLN 112,795.00 &#8220;Implementation of digital technology in UCEES Sp. z o.o. sp.k., through the purchase of the AEC Collection license for parametric building information modeling (BIM) and IT equipment, in connection with the need to make changes to processes and the way the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2300","post","type-post","status-publish","format-standard","hentry","category-bez-kategorii"],"acf":[],"_links":{"self":[{"href":"https:\/\/ucees.pl\/en\/wp-json\/wp\/v2\/posts\/2300"}],"collection":[{"href":"https:\/\/ucees.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ucees.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ucees.pl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ucees.pl\/en\/wp-json\/wp\/v2\/comments?post=2300"}],"version-history":[{"count":5,"href":"https:\/\/ucees.pl\/en\/wp-json\/wp\/v2\/posts\/2300\/revisions"}],"predecessor-version":[{"id":4044,"href":"https:\/\/ucees.pl\/en\/wp-json\/wp\/v2\/posts\/2300\/revisions\/4044"}],"wp:attachment":[{"href":"https:\/\/ucees.pl\/en\/wp-json\/wp\/v2\/media?parent=2300"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ucees.pl\/en\/wp-json\/wp\/v2\/categories?post=2300"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ucees.pl\/en\/wp-json\/wp\/v2\/tags?post=2300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}